
Boker Magnum Long Lead EDC Folder Knife For Everyday Carry Enthusiasts, Slim Satin 8Cr13MoV Blade, Black G10 Handle
The Boker Magnum Long Lead EDC Folder 01SC080 is a compact, everyday carry knife built for reliable daily tasks. With a satin blade, rugged black G10 handle, and a traditional slip-joint, it’s designed for users who want a low-profile, dependable folder without a locking mechanism.
- Blade Length: 3.13" (7.95 cm)
- Blade Material: 8Cr13MoV stainless steel
- Blade Finish: Satin
- Closed Length: 4.13" (10.49 cm)
- Handle Material: Black G10
- Carry: Pocket clip
- Locking Mechanism: Slip Joint
- Packaging: Boxed
This setup delivers a practical balance of control, edge retention, and everyday versatility. The 8Cr13MoV steel provides dependable hardness and ease of sharpening, while the satin blade hides minor use marks over time. Black G10 scales offer a confident grip in varied conditions, and the slim closed profile slides easily in pockets or bags for quick access. The slip-joint design keeps operation straightforward and low-profile for work, travel, or daily errands. Packaged in a box, it also makes a thoughtful gift for knife enthusiasts or newcomers exploring their first non-locking folder.
